Filter
ID :  till 
Mnemonic code:
Code in external DB source:
Name:
Tags:
Sorting:  till 
Preview text:
Detailed description:
Activity Start Date: Select date in calendarSelect date in calendar
Activity End Date: Select date in calendarSelect date in calendar
Number of shows:  till 
Information Block type:
Information Block ID:
Information Block mnemonic code:
Information Block name:
Information Block code in external DB source:
Create date: Select date in calendarSelect date in calendar
Описание:
Теги:
Автор:
Рубрика:
  

Journal

Presently there are more and more construction pro­jects that require reinforcement. To ensure the quality of supplied concrete the Gvozdev Research I...
Issue №1, 2021
Section: Standartization and quality
Keywords: incoming control system at the construction site, contract for the supply of concrete, control post, on-site laboratory, invited laboratory, stripping strength, design strength
Autor: S. A. Podmazova, B.S. Sokolov, M.V. Glushkova, N.S. Dmitriev.

The use of materials published on the site is allowed only with reference to the source (the journal «Cement and its application») and a hyperlink to the quoted material.
© 2007-2024 PetroCem Ltd
Privacy policy